24,026 m² · €75,000 · agricultural land outside the plan

An olive grove above the sea, under the Glamping sign Architectural visualisation
24,026 m² €75,000 €3.12 per m² 1,000 m to the beach 24 domes Checked on 1 Oct 2026

The plot

Pelion, Magnesia

Legal status: agrotemachio outside the town plan, agricultural zone

  • About 500 olive trees on a hilltop with a sea view
  • Own borehole and electricity already connected; a 75 m² ground-floor warehouse
  • Dirt road to the plot; the beach village and tavernas are below
  • Pelion has two seasons: the sea in summer, the Agriolefkes ski centre in winter

We show the area, not the exact plot. Ask us for the listing.

Pelion, Magnesia

The rule

A house yes, a hotel no, glamping yes

Outside the plan, a plot over 4,000 m² may take a house of 186 m², not a hotel. A glamping site with light structures runs under the Ministry of Tourism’s five-year Glamping sign.

Law 4759/2020, art. 33: outside the plan, land is buildable from 4,000 m²; 186 m² for the first 4,000 m² plus 0.018 of the rest. For this plot roughly 546 m² of house, no hotel. Tourist installations on 4,000 m² or more run at a 0.2 coefficient with a site-suitability approval from the Ministry of Tourism.

Law 4688/2020: the Glamping sign, valid five years, for hotels and campsites outside the plan with light structures in harmony with the landscape; domes are named explicitly.

Ministerial Decision 26716/2025 (Gazette B 7201, 31.12.2025): up to 4 beds plus 2 for children per structure, at least 10 m between structures, at least 50% vegetation cover, 4- and 5-star categories.

Ministerial Decision 14129/2015, art. 2 and 4: a single plot of at least 6,000 m², average slope up to 10%, a side of at least 50 m; fixed units up to one per 1,000 m² and 30 in total; at least 10% of pitches kept for tents.

Sources: Law 4759/2020 · Ministerial Decision 26716/2025 · Ministerial Decision 14129/2015 · Glamping sign, Ministry of Tourism

Capacity

24 SkyLodge 6

The rule sets the number: one fixed unit per 1,000 m², so 24,026 m² allow 24 domes, the maximum this plot can take. At 10 m spacing they use about 9,600 m², 40% of the land; the olives stay between them. Three tent pitches satisfy the 10% rule.

The numbers

Land today, site tomorrow

Move the sliders. The model uses the catalogue price of SkyLodge 6 Classic and the assumptions listed under the table.

€1,138,800annual revenue
€512,460operating resultRevenue × operating margin.
1.8 yrspayback
€75,000the land today
€5.69Mthe working siteLand, domes, infrastructure and the running business together, valued by the income they produce: operating result ÷ capitalisation rate.
Investment€
Land, incl. transaction costs€75,000 + about 5% transfer tax, notary and lawyer€78,750
Domes, catalogue price24 × €25,000€600,000
Installation, furnishing, connections24 × €5,000€120,000
Infrastructure, mid of the range€65,000–€115,000: Borehole and electricity exist; the warehouse becomes the reception. Paths, wastewater treatment, road improvement and landscaping.€90,000
Design and permitsTopographic survey, site-suitability file, environmental screening, operating notification, Glamping sign.€20,000
Total investment€908,750

Why two values

The land does not become five times more expensive. The site on it does, because a working hospitality asset is valued by its income: operating result divided by a rate of return. At 7% it is worth more, at 10% less. The slider is there for that reason. Everything on this page is indicative, with ranges, and dated.

Assumptions

Luxury suites in Pelion sell at €140–245 a night, a Relais & Châteaux suite in Chalkidiki from €306, a dome with a pool in Crete at €374. A glazed dome with a sea view and two seasons justifies €260 at 50% occupancy.

Checked on 1 October 2026. Listing seen on a local property portal on 1 October 2026. We show the area, not the exact plot. Ask us for the listing.

Before we offer

What we verify on this exact plot

01

Average slope from a topographic survey: the listing says hilltop, the rule says up to 10% or engineering works at the operator’s cost.

02

Forest map: the olive grove must be classified as agricultural, not forest.

03

Archaeology and Natura 2000 layers for Pelion; the shoreline setback is not an issue at 1,000 m.

04

Site-suitability approval and operating notification through the Ministry of Tourism; wastewater under art. 7 of Decision 14129/2015 as amended in June 2026.

Have land of your own?

Send us the plot number and the country. We check the rule, estimate the capacity and send back an indicative model within a week.

Or talk to us directly: +359 87 985 6644 · office@skylodges.eu